Sports Internetional Bilkent

All Mechanical Installation And Maintenance Repair

In the project, the newly constructed pool complex is made of heating, cooling and ventilation systems. In the current building, ventilation and air conditioning installation maintenance, repair, renovation and system addition were made. The project is completed in 3 months.

Used Products:

  • 4 Units Channels Type Air Conditioning
  • 1 Unit Pool Dehumidification Ventilation
  • Power Plant 1 Unit Mixed Air Handling Units
  • 8 Units Heating Circulation Pumps
  • 2 Units Plate Heat Exchanger
  • 1 Unit Automatic Control System
  • 1 Unit Floor Heating System