All mechanical installations at the hotel; cooling, ventilation, sewage automatic control, fire is made by us. Almost all of the project has been revised in place. The system is provided with heating cooling fan coil devices. The general places are air conditioned with air conditioning units. The project is completed in 2 years.

Used Products

  • 4 Heating Boiler
  • 2 Units Water Cooled Chiller
  • 70 Air Handling Units
  • 50 Units Cell Type Aspirator
  • 20 Boilers
  • 10 Units Plated Heat Exchanger
  • 4 Units of Water Hydrophore
  • 94 Units Heating - Cooling Circulation Pump