Medical installment and heating, cooling, ventilation works are done in the project. All heating and cooling system is done with a hidden ceiling type fancoil device. 2 medical care and 4 operating room in the project are heated and cooled through hygenic conditioner. The project has all the units that should be in a full-fledged hospital. The project is completed in 18 months

Used Products:

  • 2 Units Heating Caldrons
  • 1 Unit Air Cooled Group
  • 10 Air Handling Units
  • 2 Hygienic Air Handling Units
  • 12 Units Cell Aspirator
  • 1 Unit Roof Top Air Conditioner
  • 1 Unit Fire hydrafor
  • 1 Unit Using Water Hydrafor
  • 8 Units Heating - Cooling Circulation Pump
  • 2 Units Laminar Flow Devices
  • 3 Units Steam Moisturizer