In the scope of the project; There is a two-floor car park, ground floor where the stores are located, the first and second floors where the shops are located, the wedding hall, the third floor where fast food and restaurants are located. The fan-coil devices used are designed with four pipes. The air handling units were selected as a mixed air handling unit. The project is completed with a total of four people for a total of 2 months.

Used Products

  • 22 Air Handling Units
  • 20 Unit Cell Aspirator
  • 2 Unit Heating Boiler
  • 8 Unit Heating – Cooling Circulation Pump
  • 1 Unit Cooling Group