Heating, cooling, ventilation, and plumbing works were carried out by our company. The system was conditioned using fan coil units. Heat recovery ventilation units were used within the system. Hood exhaust systems were also installed. The project was completed within 2 months.
Products Used
2 Wall-Type Condensing Boilers
1 Chiller Unit
3 Heat Recovery Fresh Air Units
1 Air Handling Unit
7 Exhaust Fans
10 Fan Coil Units
2 VRF Air Conditioning Systems
10 Heating and Cooling Circulation Pumps