
The project includes a conference hall with a capacity of 1,000 people, a 400 m² restaurant, and three separate foyer areas. All of these spaces were air-conditioned using air handling units. The project was completed within 12 months.
Products Used
22 Air Handling Units
20 Cell-Type Exhaust Fans
1 Chiller Unit
6 Air Handling Units
8 Cell-Type Exhaust Fans
2 Heating Boilers
8 Heating and Cooling Circulation Pumps