Ventilation systems were installed throughout all showroom areas, vehicle maintenance sections, storage areas, service departments, paint workshops, and production areas of the project. The showroom was air-conditioned through a dedicated HVAC ventilation system. Office and administrative sections were air-conditioned using fan coil systems, and ventilation installations were also carried out in these areas. The project was completed on a partial material supply basis and was finalized within 18 months.
Products Used
4 Air Handling Units with Heat Recovery
1 Mixed Air Handling Unit
4 Cell-Type Exhaust Fans
1 Chiller Unit
8 Cascade Condensing Boilers
30 Fan Coil Units