Complete Mechanical Installation, Maintenance, and Repair
The project included the installation of heating, cooling, and ventilation systems for the newly constructed swimming pool complex. In the existing building, maintenance, repair, renovation, and system upgrades were carried out for the ventilation and air conditioning systems. The project was completed within 3 months.
Products Used
1 Underfloor Heating System
4 Ducted Air Conditioning Units
1 Pool Dehumidification and Ventilation Air Handling Unit
1 Mixed Air Handling Unit
8 Heating Circulation Pumps
2 Plate Heat Exchangers
1 Automatic Control System