The project included heating, cooling, ventilation, fire protection, and plumbing installations. The entire heating and cooling system was designed using concealed ceiling-type fan coil units. The project’s 4 operating rooms and 2 intensive care units are heated, cooled, and ventilated through hygienic air handling units. The facility includes all departments and units required in a fully equipped hospital. The project was completed within a total of 18 months.
Products Used:
2 Heating Boilers
1 Air-Cooled Chiller Unit
10 Air Handling Units
2 Hygienic Air Handling Units
12 Cell-Type Exhaust Fans
1 Rooftop Air Conditioning Unit
1 Fire Booster Pump
1 Domestic Water Booster Pump
8 Heating and Cooling Circulation Pumps
2 Laminar Flow Units
3 Steam Humidifiers