In this project, the cooling and ventilation of the common areas were provided by rooftop air conditioning units. Hygienic HVAC installations were carried out for the 2 operating rooms and 3 intensive care units within the facility. The project was completed within 6 months.
Products Used
1 Rooftop Air Conditioning Unit
2 Hygienic Air Handling Units
2 Cell-Type Exhaust Fans
2 Condenser and Gas Coil Units with Control Panels
2 Floor-Standing Air Conditioning Units